Sunday, February 26, 2012

The Frame 30/01/2012

Frame is up - woo hoo

Somehow between all the rain in Feb they managed to get the frame up. 

                                                          Ground floor done!

                                                            From the front on the side

                                                     From the back on the side

                                                       Looking from the back

Top floor hallway

                                                                  Front the front

From the back

Main bedroom ensuite - Rick in the toilet

No comments:

Post a Comment

Thanks for stopping by and taking the time to comment on my Blog :-)